Quick answer: The first part of Bengaluru’s Namma Metro Pink Line, a 7.5 km elevated stretch from Kalena Agrahara to Tavarekere with six stations, was due to be inaugurated on 13 November 2026 and to start carrying passengers from 6 am on 14 November. Fares and exact timings had not been confirmed in the reports we read, so check BMRCL. The underground section and the full 21.26 km line are targeted for May 2027.
The Pink Line has missed many deadlines since it was first planned, so this opening matters to people living along Bannerghatta Road. This guide lists the stations, the connections, what we know about fares and timings, and when the rest of the line may open.
The opening at a glance
| Item | Detail |
|---|---|
| Section open first | Kalena Agrahara to Tavarekere (elevated) |
| Length | 7.5 km |
| Stations | 6 |
| Inauguration | 13 November 2026, as announced by Karnataka’s Development Minister |
| Passenger service | From 6 am on 14 November 2026, per the same announcement |
| Network length after opening | About 103.6 km, up from 96.1 km |
The date was reported repeatedly through the year as targets moved from May to August, September and October. One news report also said Prime Minister Narendra Modi was likely to take part in the inauguration. Confirm the current status on BMRCL’s channels before you plan a trip.
Station list (north to south)
- Tavarekere (Swagath Road Cross)
- Jayadeva Hospital, an interchange with the Yellow Line
- JP Nagar 4th Phase, a planned future interchange with the Orange Line
- IIM Bangalore
- Hulimavu
- Kalena Agrahara
The stretch runs along Bannerghatta Road. At Jayadeva, the Pink platforms are reported to sit above the Yellow platforms, which should make the vertical change easier.
Timings and frequency
Reports ahead of opening mentioned a 6 am start on the first day and trains every few minutes at first. BMRCL planned to start with three to four train sets and add more later, with 53 trains due for the line in total. Network-wide operating hours are roughly 5 am to 11 pm in some listings, but those are planning figures rather than a confirmed Pink Line timetable, so check the BMRCL app or website for the current schedule.
Fares
The fare for the Pink Line had not been announced in the reports we read. Reports expect it to follow the existing Namma Metro distance-based fare table. Older articles quote a range of Rs 10 to Rs 60, while a network overview page lists Rs 15 to Rs 85 after revisions, so use the fare chart on the BMRCL site rather than any third-party figure. Smart cards, the National Common Mobility Card and QR tickets on the Namma Metro app are the usual payment options.
The full Pink Line
The complete corridor is about 21.26 km with 18 stations, from Kalena Agrahara in the south to Nagawara in the north. Only the elevated section is opening now. The underground part, which includes Shivajinagar, Cantonment, Pottery Town, Tannery Road, Venkateshpura, Kadugundanahalli and Nagawara, is still under construction, with trial runs planned. Reports from November 2026 say BMRCL is targeting May 2027 for the entire line, and earlier targets have repeatedly slipped.
A planned connection from Nagawara to the Blue Line towards Kempegowda International Airport would eventually give another route from south Bengaluru to the airport.
Tips for your first trips
- Expect crowds in the first fortnight and allow extra time.
- Carry a smart card or use the app so you do not queue for tokens.
- Allow a few minutes at Jayadeva Hospital to change lines.
- Use the BMTC app to find feeder buses to stations.
- Check BMRCL notices for any change in services in the first week.
Why the opening matters
The first stretch gives residents along Bannerghatta Road a direct metro link and brings the network past 100 km. Officials said the government aims to exceed 170 km within the next 18 months. For other transport and infrastructure news, see our free tools hub and our guide to RAC ticket meanings on Indian Railways.
Frequently asked questions
When does the Pink Line open to passengers?
The elevated stretch was to be inaugurated on 13 November 2026 and to start carrying passengers from 6 am on 14 November, according to the Karnataka minister’s announcement. Confirm with BMRCL.
Which stations are on the opened section?
Kalena Agrahara, Hulimavu, IIM Bangalore, JP Nagar 4th Phase, Jayadeva Hospital and Tavarekere.
How long is the opened section?
It is 7.5 km long with six elevated stations.
When will the full Pink Line open?
Reports in November 2026 say BMRCL is targeting May 2027 for the entire line, but dates have changed several times.
What is the Pink Line fare?
It had not been announced in the reports we read. Check the BMRCL fare chart.
Where does it connect to other lines?
Jayadeva Hospital connects with the Yellow Line, and JP Nagar 4th Phase is planned as an interchange with the future Orange Line.
Sources
- The Week (PTI): Pink Line inauguration on 13 November
- OneIndia: Pink Line inauguration on 13 November
- OneIndia: Pink Line clears safety inspection
- OneIndia: Pink Line opening and station list
- ChannelIAM: Bengaluru Metro Pink Line inauguration
- Bengaluru Metro Rail Corporation (BMRCL)
Last checked: 15 November 2026. Dates, fares and timings can change, so verify with BMRCL before you travel.

